Add projects/base_camp_townhouse.md
This commit is contained in:
98
projects/base_camp_townhouse.md
Normal file
98
projects/base_camp_townhouse.md
Normal file
@@ -0,0 +1,98 @@
|
|||||||
|
# **Global Base Camp Townhouse Template**
|
||||||
|
|
||||||
|
## **I. Acquisition Criteria**
|
||||||
|
|
||||||
|
### **Property Selection**
|
||||||
|
- **Type:** Mid-range townhouse/condo
|
||||||
|
- **Age:** 10-30 years (value opportunity)
|
||||||
|
- **Size:** 2-3 bedrooms, 2 baths, 1,000-1,500 sqft
|
||||||
|
- **Location:** Established neighborhoods near transit
|
||||||
|
- **Condition:** Structurally sound but dated interiors
|
||||||
|
- **HOA:** Must allow smart home modifications
|
||||||
|
- **Price:** 10-15% below market for renovation buffer
|
||||||
|
|
||||||
|
## **II. "Command Center" Security Protocol**
|
||||||
|
|
||||||
|
### **Digital Perimeter**
|
||||||
|
- **Access:** Smart lock system with unique codes per property
|
||||||
|
- **Monitoring:** 4-camera minimum (entry points + common area)
|
||||||
|
- **Alerts:** Water leak sensors, temperature monitoring
|
||||||
|
- **Deterrence:** Randomized lighting schedules
|
||||||
|
- **Backup:** Local property manager with emergency access
|
||||||
|
|
||||||
|
### **Physical Hardening**
|
||||||
|
- Reinforced door frames and strike plates
|
||||||
|
- Window sensors on all ground-level access points
|
||||||
|
- Smart garage door controller with tilt sensors
|
||||||
|
- Fire/CO detectors with cellular backup
|
||||||
|
|
||||||
|
## **III. "Set-and-Forget" Infrastructure**
|
||||||
|
|
||||||
|
### **Mechanical Systems**
|
||||||
|
- **HVAC:** New high-efficiency unit + Wi-Fi thermostat
|
||||||
|
- **Plumbing:** Automatic water shut-off valves
|
||||||
|
- **Electrical:** Whole-home surge protector
|
||||||
|
- **Internet:** Business-grade router with remote reboot capability
|
||||||
|
|
||||||
|
### **Maintenance-Free Interiors**
|
||||||
|
- **Flooring:** Waterproof LVP throughout
|
||||||
|
- **Paint:** Washable satin finish, neutral palette
|
||||||
|
- **Surfaces:** Quartz countertops (consistent across properties)
|
||||||
|
- **Window treatments:** Cordless blinds for safety
|
||||||
|
|
||||||
|
## **IV. Operational Protocol**
|
||||||
|
|
||||||
|
### **Pre-Departure Checklist**
|
||||||
|
1. Enable security system and camera monitoring
|
||||||
|
2. Set thermostat to eco mode (55°F-85°F range)
|
||||||
|
3. Test water shut-off system
|
||||||
|
4. Notify property manager of departure date
|
||||||
|
5. Schedule mid-stay cleaning (if extended absence)
|
||||||
|
|
||||||
|
### **Remote Management Stack**
|
||||||
|
- **Primary:** Unified smart home app (Google Home/Apple HomeKit)
|
||||||
|
- **Backup:** Individual manufacturer apps
|
||||||
|
- **Monitoring:** 24/7 professional security service
|
||||||
|
- **Local contact:** Trusted property manager
|
||||||
|
|
||||||
|
## **V. Financial Framework**
|
||||||
|
|
||||||
|
### **Acquisition Budget**
|
||||||
|
- Purchase: 80-85% of local market value
|
||||||
|
- Renovation: 15-20% of purchase price
|
||||||
|
- Contingency: 5% buffer for surprises
|
||||||
|
|
||||||
|
### **Ongoing Costs**
|
||||||
|
- Property management: $100-200/month
|
||||||
|
- Security monitoring: $30-50/month
|
||||||
|
- Utilities (baseline): $150-250/month
|
||||||
|
- HOA fees: Budget accordingly
|
||||||
|
- Cleaning service: As needed
|
||||||
|
|
||||||
|
## **VI. Quality Control Standards**
|
||||||
|
|
||||||
|
### **Consistent Specifications**
|
||||||
|
- Same lock brand/model across all properties
|
||||||
|
- Identical camera systems for unified monitoring
|
||||||
|
- Standardized appliance brands for easy maintenance
|
||||||
|
- Uniform smart home ecosystem
|
||||||
|
|
||||||
|
### **Documentation Requirements**
|
||||||
|
- Digital "passport" for each property
|
||||||
|
- Vendor contact list (local contractors)
|
||||||
|
- Emergency procedures manual
|
||||||
|
- Maintenance schedule tracker
|
||||||
|
|
||||||
|
## **VII. Exit Strategy**
|
||||||
|
|
||||||
|
### **Resale Optimization**
|
||||||
|
- Maintain renovation records for value proof
|
||||||
|
- Target 20% equity gain after 2-3 years
|
||||||
|
- Consider rental income during off-periods
|
||||||
|
- Portfolio approach allows strategic sales
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
**Implementation Priority:** Complete one property as prototype, refine template, then scale to additional locations using identical systems and procedures.
|
||||||
|
|
||||||
|
This template creates interchangeable, resilient bases that provide security and consistency across your global network—turning multiple properties into a unified system rather than separate burdens.
|
||||||
Reference in New Issue
Block a user