@@ -42,38 +42,39 @@ gantt
|
|||||||
Project Close-Out :f3, after f2, 3d
|
Project Close-Out :f3, after f2, 3d
|
||||||
```
|
```
|
||||||
|
|
||||||
---
|
|
||||||
|
|
||||||
|
|
||||||
### Detailed Breakdown
|
### Detailed Breakdown
|
||||||
|
|
||||||
#### Planning and Preparation
|
#### Planning and Preparation (2024-08-01 to 2024-09-08)
|
||||||
- **Define Project Scope (2024-08-01 to 2024-08-07)**: Establish the project’s objectives, deliverables, and constraints.
|
1. **Define Project Scope**: Establish project objectives and deliverables.
|
||||||
- **Requirements Gathering (2024-08-08 to 2024-08-18)**: Identify all technical and business requirements for the new network.
|
2. **Requirements Gathering**: Identify technical and business needs.
|
||||||
- **Infrastructure Assessment (2024-08-19 to 2024-08-29)**: Assess the current network infrastructure to plan the rip and replace strategy.
|
3. **Infrastructure Assessment**: Evaluate current network setup.
|
||||||
- **Create Detailed Project Plan (2024-08-30 to 2024-09-05)**: Develop a comprehensive project plan, including timelines, resources, and risk management.
|
4. **Create Project Plan**: Develop a comprehensive project plan.
|
||||||
- **Stakeholder Approval (2024-09-06 to 2024-09-08)**: Obtain approval from all stakeholders to proceed with the project.
|
5. **Stakeholder Approval**: Obtain necessary approvals.
|
||||||
|
|
||||||
#### Procurement and Setup
|
#### Procurement and Setup (2024-09-01 to 2024-09-26)
|
||||||
- **Order New Hardware (2024-09-01 to 2024-09-14)**: Place orders for all new networking equipment.
|
1. **Order New Hardware**: Procure all required networking equipment.
|
||||||
- **Receive and Inventory Equipment (2024-09-15 to 2024-09-21)**: Receive, inspect, and inventory all equipment.
|
2. **Receive and Inventory Equipment**: Inspect and catalog equipment.
|
||||||
- **License Procurement (2024-09-22 to 2024-09-26)**: Procure necessary licenses for the new hardware and software.
|
3. **License Procurement**: Acquire necessary licenses for new hardware.
|
||||||
|
|
||||||
#### Site Preparation
|
#### Site Preparation (2024-09-22 to 2024-10-07)
|
||||||
- **Site Surveys (2024-09-22 to 2024-10-02)**: Conduct site surveys to determine optimal hardware placement.
|
1. **Site Surveys**: Conduct surveys to determine hardware placement.
|
||||||
- **Pre-Installation Checks (2024-10-03 to 2024-10-07)**: Perform checks to ensure sites are ready for installation.
|
2. **Pre-Installation Checks**: Ensure sites are ready for installation.
|
||||||
|
|
||||||
#### Network Deployment
|
#### Network Deployment (2024-10-10 to 2024-11-07)
|
||||||
- **Decommission Old Equipment (2024-10-10 to 2024-10-14)**: Remove old network equipment.
|
1. **Decommission Old Equipment**: Remove outdated network devices.
|
||||||
- **Install New Hardware (2024-10-15 to 2024-10-28)**: Install the new networking hardware.
|
2. **Install New Hardware**: Set up new networking equipment.
|
||||||
- **Initial Configuration and Testing (2024-10-29 to 2024-11-07)**: Configure and test the new network setup.
|
3. **Initial Configuration and Testing**: Configure and test the new network.
|
||||||
|
|
||||||
#### Network Cutover
|
#### Network Cutover (2024-10-30 to 2024-12-08)
|
||||||
- **Pilot Branch Migration (2024-10-30 to 2024-11-03)**: Migrate a pilot branch to the new network to validate the process.
|
1. **Pilot Branch Migration**: Transition a pilot branch to the new network.
|
||||||
- **Validate Pilot Branch (2024-11-04 to 2024-11-06)**: Ensure the pilot branch is operating correctly.
|
2. **Validate Pilot Branch**: Ensure pilot branch operates correctly.
|
||||||
- **Full Branch Migration (2024-11-07 to 2024-11-27)**: Migrate all remaining branches to the new network.
|
3. **Full Branch Migration**: Transition all branches to the new network.
|
||||||
- **Post-Migration Validation (2024-11-28 to 2024-12-08)**: Validate the operation of all branches post-migration.
|
4. **Post-Migration Validation**: Verify network functionality post-migration.
|
||||||
|
|
||||||
#### Finalization and Handover
|
#### Finalization and Handover (2024-11-30 to 2024-12-14)
|
||||||
- **Training and Documentation (2024-11-30 to 2024-12-06)**: Provide training and documentation to the operations team.
|
1. **Training and Documentation**: Provide necessary training and documentation.
|
||||||
- **Handover to Operations Team (2024-12-07 to 2024-12-11)**: Officially hand over
|
2. **Handover to Operations Team**: Officially transfer network management.
|
||||||
|
3. **Project Close-Out**: Finalize all project activities and documentation.
|
||||||
|
|
||||||
|
This timeline provides a clear and concise overview of the major phases and tasks involved in the managed network services takeover, ensuring readability and ease of understanding.
|
||||||