core updates
This commit is contained in:
@@ -1,66 +0,0 @@
|
||||
# Documentation Process for Productivity System
|
||||
|
||||
## Introduction
|
||||
|
||||
- Explain the importance of documentation in a productivity system.
|
||||
- Highlight how documentation enhances organization, collaboration, and clarity.
|
||||
|
||||
## Identify Folder Documentation Needs
|
||||
|
||||
- Explain the criteria for selecting folders that require documentation.
|
||||
- Discuss the factors to consider, such as complexity, multiple contributors, or specific requirements.
|
||||
|
||||
## Document Template Creation
|
||||
|
||||
- Discuss the creation of a standardized document template for folder documentation.
|
||||
- Highlight the sections to include, such as folder overview, purpose of files, folder structure, naming conventions, collaboration guidelines, and documentation updates.
|
||||
|
||||
## Building Folder Documentation
|
||||
|
||||
### Folder Overview
|
||||
|
||||
1. Describe the purpose and significance of the folder.
|
||||
2. Explain how it contributes to the overall productivity system.
|
||||
|
||||
### Purpose of Files
|
||||
|
||||
1. Detail the types of files stored in the folder.
|
||||
2. Explain how these files align with the category or focus area.
|
||||
3. Provide examples to illustrate the importance of these files.
|
||||
|
||||
### Folder Structure
|
||||
|
||||
1. Outline the subfolders or sections within the folder.
|
||||
2. Describe the purpose of each subfolder and its organization.
|
||||
|
||||
### Naming Conventions
|
||||
|
||||
1. Specify the naming convention for files within the folder.
|
||||
2. Provide the format, elements, and guidelines for consistent naming.
|
||||
3. Offer examples to demonstrate the naming convention.
|
||||
|
||||
### Collaboration Guidelines
|
||||
|
||||
1. Explain how collaboration should take place within the folder.
|
||||
2. Define preferred communication methods and collaboration tools.
|
||||
3. Highlight any specific instructions or permissions for collaboration.
|
||||
|
||||
### Documentation Updates
|
||||
|
||||
1. Emphasize the need for regular updates to the documentation.
|
||||
2. Encourage reviewing and revising the documentation as the folder evolves.
|
||||
|
||||
## Communicating the Benefits
|
||||
|
||||
- Discuss the advantages of having comprehensive folder documentation.
|
||||
- Highlight how it enhances understanding, collaboration, and productivity.
|
||||
|
||||
## Sharing and Implementation
|
||||
|
||||
- Explain how to make the documentation easily accessible to team members or contributors.
|
||||
- Discuss the process of sharing and communicating the documentation guidelines.
|
||||
|
||||
## Conclusion
|
||||
|
||||
- Summarize the importance of folder documentation in your productivity system.
|
||||
- Encourage the ongoing use and maintenance of the documentation to maximize its benefits.
|
||||
@@ -1,61 +0,0 @@
|
||||
## Boat Sale and Pop-up Storage Preparation
|
||||
|
||||
## Boat Sale Preparation
|
||||
|
||||
- Deadline: May 1st
|
||||
- Task Breakdown:
|
||||
|
||||
### Photography
|
||||
|
||||
- Take pictures of the boat with cover on
|
||||
- Take pictures of the frame for the cover
|
||||
|
||||
### Remove Items from Boat
|
||||
|
||||
- Remove fire pit
|
||||
- Remove gas grill (leave grill brackets for new owner)
|
||||
- Remove propane rack and tank
|
||||
- Remove propane lines
|
||||
|
||||
### Boat Cleaning
|
||||
|
||||
- Clean up boat
|
||||
- Take pictures after cleaning
|
||||
|
||||
### Listing
|
||||
|
||||
- Post on Facebook Marketplace
|
||||
- Price: $6500 with both motors or $6000 without the 35HP motor
|
||||
|
||||
### Addressing Issues (Optional)
|
||||
|
||||
- Non-functional gauges: Speedometer, RPM, temperature
|
||||
- Hole in front of the console
|
||||
|
||||
### Inclusions
|
||||
|
||||
- Sell boat with all life vests
|
||||
- Offer all stuff/parts in the garage
|
||||
|
||||
## Pop-up Storage Installation at Mike's House
|
||||
|
||||
### New Gate Installation
|
||||
|
||||
- Dig out holes for new 4x4 posts
|
||||
- Set new 4x4 posts and concrete posts into the ground
|
||||
- Stabilize posts to set
|
||||
- Allow concrete to dry for several days
|
||||
|
||||
### Build new gates
|
||||
|
||||
- Install hardware for installation
|
||||
- Determine and purchase gate frame hardware, hinges, latch, screws/bolts, and wheels
|
||||
|
||||
### Pop-up Storage
|
||||
|
||||
- Place camper on Mike's lawn temporarily if the new gate is not completed before May
|
||||
- Limit the time on the lawn for security reasons
|
||||
|
||||
### Boat Storage Contingency Plan
|
||||
|
||||
- In case the boat is not sold by the time the rental space needs to be vacated, find a temporary storage location for the boat.
|
||||
Reference in New Issue
Block a user