core updates
This commit is contained in:
@@ -1,66 +0,0 @@
|
|||||||
# Documentation Process for Productivity System
|
|
||||||
|
|
||||||
## Introduction
|
|
||||||
|
|
||||||
- Explain the importance of documentation in a productivity system.
|
|
||||||
- Highlight how documentation enhances organization, collaboration, and clarity.
|
|
||||||
|
|
||||||
## Identify Folder Documentation Needs
|
|
||||||
|
|
||||||
- Explain the criteria for selecting folders that require documentation.
|
|
||||||
- Discuss the factors to consider, such as complexity, multiple contributors, or specific requirements.
|
|
||||||
|
|
||||||
## Document Template Creation
|
|
||||||
|
|
||||||
- Discuss the creation of a standardized document template for folder documentation.
|
|
||||||
- Highlight the sections to include, such as folder overview, purpose of files, folder structure, naming conventions, collaboration guidelines, and documentation updates.
|
|
||||||
|
|
||||||
## Building Folder Documentation
|
|
||||||
|
|
||||||
### Folder Overview
|
|
||||||
|
|
||||||
1. Describe the purpose and significance of the folder.
|
|
||||||
2. Explain how it contributes to the overall productivity system.
|
|
||||||
|
|
||||||
### Purpose of Files
|
|
||||||
|
|
||||||
1. Detail the types of files stored in the folder.
|
|
||||||
2. Explain how these files align with the category or focus area.
|
|
||||||
3. Provide examples to illustrate the importance of these files.
|
|
||||||
|
|
||||||
### Folder Structure
|
|
||||||
|
|
||||||
1. Outline the subfolders or sections within the folder.
|
|
||||||
2. Describe the purpose of each subfolder and its organization.
|
|
||||||
|
|
||||||
### Naming Conventions
|
|
||||||
|
|
||||||
1. Specify the naming convention for files within the folder.
|
|
||||||
2. Provide the format, elements, and guidelines for consistent naming.
|
|
||||||
3. Offer examples to demonstrate the naming convention.
|
|
||||||
|
|
||||||
### Collaboration Guidelines
|
|
||||||
|
|
||||||
1. Explain how collaboration should take place within the folder.
|
|
||||||
2. Define preferred communication methods and collaboration tools.
|
|
||||||
3. Highlight any specific instructions or permissions for collaboration.
|
|
||||||
|
|
||||||
### Documentation Updates
|
|
||||||
|
|
||||||
1. Emphasize the need for regular updates to the documentation.
|
|
||||||
2. Encourage reviewing and revising the documentation as the folder evolves.
|
|
||||||
|
|
||||||
## Communicating the Benefits
|
|
||||||
|
|
||||||
- Discuss the advantages of having comprehensive folder documentation.
|
|
||||||
- Highlight how it enhances understanding, collaboration, and productivity.
|
|
||||||
|
|
||||||
## Sharing and Implementation
|
|
||||||
|
|
||||||
- Explain how to make the documentation easily accessible to team members or contributors.
|
|
||||||
- Discuss the process of sharing and communicating the documentation guidelines.
|
|
||||||
|
|
||||||
## Conclusion
|
|
||||||
|
|
||||||
- Summarize the importance of folder documentation in your productivity system.
|
|
||||||
- Encourage the ongoing use and maintenance of the documentation to maximize its benefits.
|
|
||||||
@@ -1,61 +0,0 @@
|
|||||||
## Boat Sale and Pop-up Storage Preparation
|
|
||||||
|
|
||||||
## Boat Sale Preparation
|
|
||||||
|
|
||||||
- Deadline: May 1st
|
|
||||||
- Task Breakdown:
|
|
||||||
|
|
||||||
### Photography
|
|
||||||
|
|
||||||
- Take pictures of the boat with cover on
|
|
||||||
- Take pictures of the frame for the cover
|
|
||||||
|
|
||||||
### Remove Items from Boat
|
|
||||||
|
|
||||||
- Remove fire pit
|
|
||||||
- Remove gas grill (leave grill brackets for new owner)
|
|
||||||
- Remove propane rack and tank
|
|
||||||
- Remove propane lines
|
|
||||||
|
|
||||||
### Boat Cleaning
|
|
||||||
|
|
||||||
- Clean up boat
|
|
||||||
- Take pictures after cleaning
|
|
||||||
|
|
||||||
### Listing
|
|
||||||
|
|
||||||
- Post on Facebook Marketplace
|
|
||||||
- Price: $6500 with both motors or $6000 without the 35HP motor
|
|
||||||
|
|
||||||
### Addressing Issues (Optional)
|
|
||||||
|
|
||||||
- Non-functional gauges: Speedometer, RPM, temperature
|
|
||||||
- Hole in front of the console
|
|
||||||
|
|
||||||
### Inclusions
|
|
||||||
|
|
||||||
- Sell boat with all life vests
|
|
||||||
- Offer all stuff/parts in the garage
|
|
||||||
|
|
||||||
## Pop-up Storage Installation at Mike's House
|
|
||||||
|
|
||||||
### New Gate Installation
|
|
||||||
|
|
||||||
- Dig out holes for new 4x4 posts
|
|
||||||
- Set new 4x4 posts and concrete posts into the ground
|
|
||||||
- Stabilize posts to set
|
|
||||||
- Allow concrete to dry for several days
|
|
||||||
|
|
||||||
### Build new gates
|
|
||||||
|
|
||||||
- Install hardware for installation
|
|
||||||
- Determine and purchase gate frame hardware, hinges, latch, screws/bolts, and wheels
|
|
||||||
|
|
||||||
### Pop-up Storage
|
|
||||||
|
|
||||||
- Place camper on Mike's lawn temporarily if the new gate is not completed before May
|
|
||||||
- Limit the time on the lawn for security reasons
|
|
||||||
|
|
||||||
### Boat Storage Contingency Plan
|
|
||||||
|
|
||||||
- In case the boat is not sold by the time the rental space needs to be vacated, find a temporary storage location for the boat.
|
|
||||||
Reference in New Issue
Block a user